FLINT HILL ROAD BRIDGE

Owner – The PA Turnpike Commission
$4.65M Construction Cost

  • Full Bridge Demolition and Reconstruction over 4 Lanes of Active Highway (PA Turnpike)
  • Reconstruction of Single-Span Steel Girder Bridge
  • Deep Cut Support of Excavation Design and Installation
  • Full-Depth Roadway Reconstruction
  • Installation of Water and Telecommunication Utilities
  • Construction of Concrete Sidewalk and Storm Water Inlets