Owner – The PA Turnpike Commission
$4.65M Construction Cost
- Full Bridge Demolition and Reconstruction over 4 Lanes of Active Highway (PA Turnpike)
- Reconstruction of Single-Span Steel Girder Bridge
- Deep Cut Support of Excavation Design and Installation
- Full-Depth Roadway Reconstruction
- Installation of Water and Telecommunication Utilities
- Construction of Concrete Sidewalk and Storm Water Inlets